We were approached by Simpson & Brown who were appointed principal designers for the refurbishment and construction of brand new facilities at Lincoln Cathedral. Lincoln Cathedral, consecrated in 1092, is located in the very heart of Lincoln and was once the tallest building in the world till its central spire collapsed in 1548. The Cathedral had recently won £16m in Heritage Lottery Fund to create the Lincoln Cathedral Connected project. This project would include a complete modernisation and refurbishment of parts of the cathedral with the introduction of a brand new education centre, café, shop and community spaces. Due to the nature of the building, level access was not possible across all of these additions therefore a variety of lifts were needed to make the site fully accessible. William Birch Construction were appointed Principal Contractor and we worked with them to deliver this lift package.
The first lift is a hidden traversing lift in the main reception area, the lift raises 350mm and traverses 480mm to meet the top step. This hidden lift features 100mm high roll off protection so that the user remains on the platform and finishes flush with the floor. It can be finished in any flooring up to a depth of 22mm which makes the platform run seamlessly into the rest of the floor. The lift is finished with remote controls so that a member of staff can raise the lift when a visitor needs to use it. The pit requirement for this lift is only 155mm.
The second lift is a cabin lift with fully automatic sliding doors, the same as a traditional passenger lift. The major difference between this lift and a passenger lift is that the pit and headroom requirement is considerably reduced. A passenger lift would require over a metre pit and 3400mm headroom whilst this lift requires only 130mm pit and 2150mm headroom. Due to the historic and archaeological nature of the site all 4 lift options were chosen with the shallowest pit depth possible. This lift provides access across two floors of the newly constructed education centre.
The third lift is an outdoor platform lift that allows access to the courtyard area with a travel of 700mm and is finished with the same wooden decking as the upper level and adjacent stairwell. The lift is made out of hot-dipped galvanised steel which is then powder-coated to provide a finish that will last over time. This means that the less maintenance costs are greatly reduced and the courtyard is accessible for longer.
The fourth lift provides access to the exhibition area of the centre and only needs a pit of 65mm. The lift has a modern look with reduced steel framework and large glass panels which match the contemporary aesthetic within the exhibition centre. We colour matched the adjacent stairwell so that the lift was finished in the same shade of black.
Location: Lincolnshire
Status: Complete
Year Completed: 2020
To see projects similar to Lincoln Cathedral click on the following links:
British Library | York Theatre Royal | Dancing Man Brewery | National Army Museum | Meriden Hall | Sissinghurst Castle Garden | 200 Grays Inn Road