Access Lifts at the Olympics

Back in 2012 we were asked by the well known temporary structure supplier Portakabin to help with the access issues for their Operations Centre in Stratford, East London during the London 2012 Olympics. They needed to provide access to the viewing platform on top of their temporary structure for mobility impaired and wheelchair bound visitors.

The specific requirements  of the lift were - it had to travel over 11 metres, they needed an external lift shaft attached to their existing structure, a through lift cabin with doors on both sides of the shaft, fire control sensors and testers and an intercom that connected directly to the main reception - they needed all of this done within 40 days! We even took into account any prevailing winds as the lift would be over 13 metres tall and attached to a temporary structure.

We initially met with Portakabin on 31st May and on the day we managed to give an immediate verbal quotation after taking all of the necessary measurements. By the afternoon we had contacted the manufacturer to produce detailed drawings of the lift and were able to provide a full quotation with the necessary builders' work. Within 5 working days Portakabin confirmed the order and the lift was installed by 29th June (only 21 days later!), this was 10 days before the deadline and the client was totally delighted with the finished product.

Location: London

Status: Complete

Year Completed: 2012

Sporting Events Lift
Olympics Lift

For more information about lifts like the one above call us on 080 65 252 65 or email us